Review of the Department of Energy s Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant

Review of the Department of Energy s Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant
Author: National Academies of Sciences, Engineering, and Medicine,Division on Earth and Life Studies,Nuclear and Radiation Studies Board,Committee on Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant
Publsiher: National Academies Press
Total Pages: 225
Release: 2020-06-01
Genre: Political Science
ISBN: 9780309498616

Download Review of the Department of Energy s Plans for Disposal of Surplus Plutonium in the Waste Isolation Pilot Plant Book in PDF, Epub and Kindle

In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.

Surplus Plutonium Disposition DOE EIS 0283 for Siting Construction and Operation of Three Facilities for Plutonium Disposition

Surplus Plutonium Disposition  DOE EIS 0283  for Siting  Construction and Operation of Three Facilities for Plutonium Disposition
Author: Anonim
Publsiher: Unknown
Total Pages: 868
Release: 1999
Genre: Electronic Book
ISBN: NWU:35556031853278

Download Surplus Plutonium Disposition DOE EIS 0283 for Siting Construction and Operation of Three Facilities for Plutonium Disposition Book in PDF, Epub and Kindle

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant
Author: National Academies of Sciences, Engineering, and Medicine,Division on Earth and Life Studies,Nuclear and Radiation Studies Board,Committee on Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant
Publsiher: National Academies Press
Total Pages: 66
Release: 2018-11-30
Genre: Science
ISBN: 9780309485036

Download Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant Book in PDF, Epub and Kindle

Disposal of Surplus Plutonium at the Waste Isolation Pilot Plant: Interim Report evaluates the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. This report evaluates DOE-NNSA's plans to ship, receive, and emplace surplus plutonium in WIPP and its understanding of the impacts of these plans on WIPP and WIPP-bound waste streams. This report, the first of two to be issued during this study, provides a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focusing on some of the barriers to their implementation.

Plutonium Disposition Program

Plutonium Disposition Program
Author: David C. Trimble
Publsiher: Unknown
Total Pages: 56
Release: 2014-03-27
Genre: Electronic Book
ISBN: 1457853639

Download Plutonium Disposition Program Book in PDF, Epub and Kindle

The Dept. of Energy's (DOE's) National Nuclear Security Admin. (NNSA) manages the Plutonium Disposition program to dispose of surplus weapons-grade plutonium by burning it as MOX fuel -- a mixture of plutonium and uranium oxides -- in specially modified commercial nuclear reactors. In 2012, DOE forecasted cost increases of close to $3 billion over the previous estimates for the program's two construction projects, the MOX facility and the Waste Solidification Building (WSB) for disposing of waste from the MOX facility. This report examines: (1) drivers NNSA identified for the cost increases; (2) the extent to which NNSA analyzed underlying causes of the cost increases; (3) steps NNSA took to hold construction contractors accountable for their role, if any, in the cost increases; and (4) the extent to which NNSA's most recent estimates met cost- and schedule-estimating best practices. Tables and figures. This is a print on demand report.

Disposing of Weapons grade Plutonium

Disposing of Weapons grade Plutonium
Author: CSIS Senior Policy Panel on the Safe, Timely, and Effective Disposition of Surplus U.S. and Russian Weapons-Grade Plutonium,John Taylor,Pete Domenici,Robert E. Ebel
Publsiher: CSIS
Total Pages: 68
Release: 1998
Genre: Political Science
ISBN: 089206336X

Download Disposing of Weapons grade Plutonium Book in PDF, Epub and Kindle

Plutonium Disposition Program

Plutonium Disposition Program
Author: United States Government Accountability,United States Government Accountability Office
Publsiher: CreateSpace
Total Pages: 56
Release: 2015-01-01
Genre: Electronic Book
ISBN: 1503371808

Download Plutonium Disposition Program Book in PDF, Epub and Kindle

The end of the cold war left the United States with a surplus of weapons-grade plutonium. Much of this material is found in a key nuclear weapon component known as a pit. In 1997, DOE announced a plan to dispose of surplus, weapons-grade plutonium through an approach that included fabrication of plutonium into MOX fuel for use in domestic commercial nuclear reactors. In 2000, the United States and Russia entered into a Plutonium Management and Disposition Agreement, in which each country pledged to dispose of at least 34 metric tons of surplus, weapons-grade plutonium. Through a protocol to the agreement signed in 2010, the United States and Russia reaffirmed their commitment to dispose of surplus, weapons-grade plutonium as MOX fuel in nuclear reactors, and the agreement entered into force in 2011.

Plutonium Disposition Program

Plutonium Disposition Program
Author: United States Government Accountability Office
Publsiher: Createspace Independent Publishing Platform
Total Pages: 56
Release: 2017-12-27
Genre: Electronic Book
ISBN: 1982019921

Download Plutonium Disposition Program Book in PDF, Epub and Kindle

PLUTONIUM DISPOSITION PROGRAM: DOE Needs to Analyze the Root Causes of Cost Increases and Develop Better Cost Estimates

Plutonium Disposition Program

Plutonium Disposition Program
Author: Government Accountability Office
Publsiher: Createspace Independent Publishing Platform
Total Pages: 56
Release: 2017-07-29
Genre: Electronic Book
ISBN: 1974030237

Download Plutonium Disposition Program Book in PDF, Epub and Kindle

Plutonium Disposition program :DOE needs to analyze the root causes of cost increases and develop better cost estimates : report to the Subcommittee on Energy and Water Development, and Related Agencies, Committee on Appropriations, House of Representatives.